For the Long Term

Regional Development and Construction

REGION 1: ILOCOS

  • GRDP Growth Forecast

 

2014

2015

2016

GRDP

6.8 – 7.8

7.3 – 8.3

8.2 – 9.2

Agriculture

5.0 – 6.0

5.6 – 6.6

6.0 – 7.0

Industry

7.0 – 8.0

8.2 – 9.2

10.0 – 11.0

Service

7.7 – 8.7

7.8 – 8.8

8.3 – 9.3

  • Plans and Projects
    • Target investments by 2016: 15% of the GDP (Php 38 billion – Php 40 billion)
    • Industrial developments:
      • Laoag City Special Economic Zone Industrial Estate
      • Ilocos Sur Special Economic Zone
      • Poro Point Special Economic Zone
      • Pangasinan Economic and Tourism Development Zone
      • Sual Industrial Estate Development
    • Tourism development
      • North Cluster
        1. Pagudpud-Bangui cluster (eco-tourism, water-oriented, scientific)
        2. Laoag-Paoay-Batac tourism circuit (casino, resort, shopping, eco-tourism)
        3. Maria-Vigan-San Juan cluster (heritage, religious, agri-tourism)
      • South Cluster
  1. San Fernando sub-cluster (resort, water-oriented, botanical garden, convention, religious, recreation)
  2. Dagupan sub-cluster (religious, Dagupan river cruise, food, shopping, cultural, historical)
  3. Alaminos sub-cluster (eco-tourism)
  • Tri-City Tourism and Ferry System (connecting San Fernando, Dagupan and Alaminos)
  • Land banking for tourism
  • Agribusiness developments
    • Establishment of multi-purpose cold storage facilities
    • Establishment of fish processing plant
    • Establishment of mango and fruit processing plant
    • Expansion of bagsakan and cattle markets
    • La Union Farmers Training Center
    • Establishment of ricemill and feedmill
    • Redevelopment of Salomague Fishport
    • Construction of Ilocos Sur Farmers Convention Center
  • Infrastructure developments
    • Construction of 1,410 classrooms for elementary, 2,157 classrooms for PPP Phase I and 241 classrooms for PPP Phase II
    • Repair and maintain 4,809 classrooms
    • Upgrade MNR to four lanes
      1. Provision of additional shoulder adjacent the concreted shoulder sections
      2. Upgrade bridges along MNR
    • Rehabilitation of Kennon Road and Marcos Highway including slope protection
    • Rehabilitation of the Bauang-Baguio-Kayapa-Aritao-Dupax del Sur-Kasibo-Nagtipunan Road
    • Narvacan-Bangued-Lagngilang-Malicking-Pasil-Tabuk-Tuguegarao Road
    • Ilocos Sur-Abra Road via Banaoang
    • Tagudin-Cervantes-Tadian-Sabangan-Bontoc-Barlig-Paracelis-Santiago, Isabela Road
    • Narvacan-Bangued-Balbalan-Lubuagan-Tabuk-Rizal-Tuguegarao, Cagayan Road
    • Pangasinan-Nueva Vizcaya Road
    • Ilocos Norte-Apayao-Sta. Ana, Cagayan Road
    • San Nicolas-Solsona-Cabugao-Conner-Abbut Road
    • Tarlac-Pangasinan-La Union Toll Expressway (TPLUTE) Phase 2-Rosales, Pangasinan-Rosario, La Union
    • Regional By-Pass Road Projects (Western Urdaneta, Candon City, San Fernando City, Laoag City)
    • Construction/Upgrading of Access Roads to identified tourism areas
    • Revival/extension of the railway system in Region I up to Laoag City in Ilocos Norte (to include evaluation of existing railway assets in the region)
    • Alaminos Airport Construction
    • Upgrading of the Laoag International Airport
    • Currimao Port Development
    • Salomague Port Development
    • Sual Commercial Seaport Development
    • Gregorio del Pilar (Ilocos Sur) Irrigation Project
    • Banaoang Pump Irrigation Project, Phase 2
    • Allied Rivers Improvement Project
    • Agno River Flood Control Project, Phase 3
    • Agno River Integrated Irrigation Project (Additional Works)
    • Amburayan River Convergence Project: Irrigation and Flood Control Project

REGION 2: CAGAYAN VALLEY

REGION 2: CAGAYAN VALLEY

  • GRDP Growth Forecast

 

2014

2015

2016

GRDP

5.09

5.42

5.65

Agriculture

4.98

5.24

5.29

Industry

5.58

5.76

5.95

Service

5.01

5.52

6.01

  • Construction is seen to boost industry sector
  • Plans and Projects
    • Industrial developments
      • Full development of Cagayan Socio Economic Zone and Free Port
      • Development of specialized zones such as Santiago City’s I.T. Park and Aparri’s Ecozone
    • Tourism developments
      • Improvement of jetty and passenger ferry services and restaurant and lodging for Isabela, Cagayan and Babuyan Islands
    • Infrastructure developments
      • Completion of Lallo International Airport including the Magapit-Mission Road
      • Construction of alternate routes to serve as entry & exit points to and from the region to improve accessibility and mobility within
  1. Northeastern Luzon Expressway
  2. Dalton Pass East Alignment Road
  3. Nueva Vizcaya-San Nicolas Road
  4. Other major routes (e.g. Ilagan-Palanan Road)
  • Rehabilitation and upgrading of the Tuguegarao, Basco, Itbayat, Bagabag and Cauayanairports

REGION 3: CENTRAL LUZON

REGION 3: CENTRAL LUZON

  • GRDP Growth Forecast

 

2014

2015

2016

GRDP

6.1 – 7.1

6.6 – 7.6

7.1 – 8.1

Agriculture

5.5 – 6.5

6.0 – 7.0

6.5 – 7.5

Industry

5.5 – 6.5

6.0 – 7.0

6.5 – 7.5

Service

7.0 – 8.0

7.5 – 8.5

8.0- 9.0

  • Plans and Projects
    • Infrastructure developments
      • Development of toll expressways or High Standard Highway 1 to complement the existing arterial North-South backbone routes or High Standard Highway 2
  1. North Luzon Expressway (widening/rehab)
  2. NLEx Extension to Tabang (Tabang Spur Road)
  3. Tipo-Subic Expressway
  4. Tarlac-Pangasinan-La Union Expressway
  5. Subic-Clark-Tarlac Expressway
  • Improvement of High Standard Highway 2 through lane addition, grade separations, and bypass construction
  1. Manila North Road/ MacArthur Highway (widening/rehab/addition)
  2. Cagayan Valley Road/Maharlika Highway (widening/rehab/addition)
  3. Plaridel Bypass Road
  • Addressing choke points and critical bottlenecks in strategic and east-west lateral roads
    1. Gapan-San Fernando-Olongapo Road (widening/rehab)
    2. Iba-Tarlac-Sta. Rosa-Pantabangan-Baler Road (widening/full paving)
    3. Capas-Botolan Road (construction, to fully integrate Zambales into the regional economy)
    4. Cruz-Mangatarem Road (construction, to connect north of Zambales to south west Pangasinan and northern Tarlac)
    5. Baler-Casiguran Road (full paving)
    6. Dinadiawan- Maddela Road
    7. Olongapo-Bugallon Road (widening)
    8. Roman Highway (widening/rehab)
    9. Mariveles-Bagac Road (fully paving)
    10. Angeles-Dinalupihan (maintenance)
    11. Bagac-Morong-Subic Road (fully paving)
  • Prioritizing local roads for rehabilitation and construction to open remote areas
  • Construction of Central Luzon Link Expressway (CLLEX)
  • Terminal expansion and modernization of the Clark International Airport
  • Development of an integrated commuter and airport express railway system
  • Development of new seaports
  • Development of bus transport terminals, bus rapid transit and integrated transport system
  • Construction of multipurpose dams for irrigation and power source
  • Construction of fish port complexes in coastal communities
  • Continued construction of classrooms, provision of economic housing and modernization of hospitals and health centers

REGION 4A: CALABARZON

REGION 4A: CALABARZON

  • GRDP Growth Forecast

 

2014

2015

2016

GRDP

5.7 – 6.7

6.2 – 7.2

6.6 – 7.6

Agriculture

2.9 – 3.9

3.0 – 4.0

3.2 – 4.2

Industry

4.7 – 5.7

5.1 – 6.1

5.5 – 6.5

Service

8.2 – 9.2

8.7 – 9.7

9.0 – 10.0

  • Agriculture development
    • Updating and implementation of the Strategic Agriculture and Development Zones
    • Construction and improvement of farm to market roads
  • Plans and Projects
    • Infrastructure developments
      • Construction of:
  1. LRT 1 and LRT 2 Extension
  2. North-South Commuter Railway
  3. SLEX Toll Road 4
  4. DPWH-DOT Convergence
  5. Calatagan Port Access Road
  6. Cavite-Laguna Expressway
  7. Quezon Eco-Tourism Road
  8. Lobo-San Juan Coastal Road
  9. Umiray Bridge and access road connecting to the municipal hub (to integrate Calabarzon and Central Luzon regions)
  10. PPP schools
  11. Construction of hospitals and Basic Emergency Maternal Obstetric and Newborn Care (BEMONC) facilities

REGION 4B: MIMAROPA

REGION 4B: MIMAROPA

REGION 5: BICOL

 

REGION 5: BICOL

  • GRDP growth of 7.0 – 8.0% in 2016
  • Plans and Projects
    • Infrastructure developments
      • Albay West Coast Road
      • Pioduran-Buenavista-Donsol Road
      • Pantao-Balatan Coastal Road
      • Bacon-Manito Road
      • Claveria-San Pascual Road
      • San Vicente-Guijalo Road
      • Daang Maharlika
      • Andaya Highway
      • Cam Sur/Albay Diversion Road
      • GUICADALE road projects
      • DOT-DPWH Convergence Program
      • Road Network Development Projects
      • Legazpi-Naga Freeway
      • PNR Main Line South
      • Bicol International Airport
      • Naga Airport Runway Re-orientation Project
      • Relocation of Masbate Airport
      • Old Legazpi Airport Re-development Project
      • Amphibian Air Terminal System
      • Legazpi Urban Flood Control and Mitigation Project

REGION 6: WESTERN VISAYAS

 

REGION 6: WESTERN VISAYAS

  • GRDP growth of 7.6 – 8.8% by 2016
  • Plans and Projects
    • Infrastructure developments
      • Upgrading of the following ports:
        1. Iloilo Commercial Port Complex
        2. Iloilo River Wharf and Port San Pedro in Iloilo City
        3. Guimaras-Iloilo ferry terminal
        4. Dumangas in Iloilo
        5. Banago, Danao, Hinoba-an and San Carlos in Negros Occidental
        6. Basiao and Culasi in Capiz
        7. Lipata in Antique
        8. Buruanga and Numancia in Aklan
        9. Caticlan Jetty port
      • Rehabilitation and expansion of the following airports:
  1. Kalibo International Airport (priority)
  2. Iloilo Airport (priority)
  3. Silay Airport (priority)
  4. Caticlan Airport (Godofredo Ramos Airport)
  5. EBJ Airport in Antique
  6. Roxas Airport in Capiz
  • Completion of Iloilo Circumferential Road
  • Widening of Iloilo-Capiz Road
  • Construction of Roxas City Circumferential Road and Bacolod-Silay Airport Access Road
  • Construction of 18,000socialized housing by 2016 (already supplied 9,938)
  • Provision of 453 instructional rooms for elementary and 986 instructional rooms for high school
  • Rehabilitation of the remaining 10 out of 46 targeted government hospitals
  • Completion of the Jalaur River Multipurpose Irrigation project
  • Rehabilitation and construction:
    1. Western Visayas Medical Center and Western Visayas Sanitarium in Iloilo
    2. Corazon Locsin Montelibano Memorial Regional Hospital in Bacolod City
    3. Don Jose S. Monfort Medical Center Extension Hospital
  • Development of the following energy sources:
  1. 8-MW Villasiga hydropower projects (started, to commercially operate before end of 2016)
  2. 18 MW Timbaban hydropower projects (started, to commercially operate before end of 2016)
  3. 1 MW Igbulo hydropower projects (started, to commercially operate before end of 2016)
  4. 50MW Nabas Wind Farm in Aklan
  5. 54MW San Lorenzo Wind Farm in Guimaras
  6. 18MW Pulupandan Wind Farm
  7. 18MW San Carlos City Biomass Power Plant in Negros Occ
  8. 18MW Madalag Hydropower in Aklan

REGION 7: CENTRAL VISAYAS

REGION 7: CENTRAL VISAYAS

  • GRDP Growth Forecast

 

2014

2015

2016

GRDP

7.6 – 8.0

8.1 – 8.5

8.6 – 9.1

Agriculture

4.3 – 4.8

5.7 – 6.2

5.9 – 6.4

Industry

8.6 – 9.1

8.8 – 9.3

9.5 – 10.0

Service

7.5 – 8.0

8.0 – 8.5

8.5 – 9.0

  • Plans and Projects
    • Agriculture developments
      • Establishment of bagsakan centers
    • Infrastructure developments
      • Road and Bridge Rehabilitation Projects
      • Road and Bridge Improvement/Pavement Projects
      • Road and Bridge Widening Projects
      • Port Improvement and Upgrading Projects
      • Port Expansion Projects
      • Airport Improvement and Upgrading Projects
      • Airpor t Expansion Projects
      • Construction of New Airports of International Standards

REGION 8: EASTERN VISAYAS

REGION 8: EASTERN VISAYAS

  • GRDP Growth Forecast

 

2014

2015

2016

GRDP

4.46 – 5.4

4.54 – 5.54

4.61 – 5.61

Agriculture

4.37 – 5.37

4.52 – 5.52

4.62 – 5.62

Industry

4.49 – 5.49

4.52 – 5.52

4.57 – 5.57

Service

4.53 – 5.53

4.59 - 5.59

4.63 – 5.63

  • Plans and Projects
    • Infrastructure developments
      • Paving 121km of national secondary roads
      • Increase number of permanent bridges in good condition along national arterial roads to 865 bridges in 2016 from 489 bridges in 2012
    • Tourism developments
      • Increase number of accommodation establishments to 508 in 2016 from 439 in 2012
      • Increase number of other tourism establishment to 7 in 2016 from 0 in 2012
    • Industry developments
      • Increase number of ICT-BPM parks from 1 in 2012 to 3 in 2016

REGION 9: ZAMBOANGA PENINSULA

REGION 9: ZAMBOANGA PENINSULA

  • GRDP growth of 5.5 – 6.5%
  • Plans and Projects
    • Infrastructure developments
      • Construction of an international seaport at ZAMBOECOZONE
      • Construction of 100 MW Circulating Fluidized Bed (CFB) Coal-Fired Power Station of the San Ramon Power Inc., located in San Ramon, Zamboanga City
      • 100 MW Sibuguey Coal-Fired Power Plant Project of the Philippine National Oil Company (PNOC), in Zamboanga Sibugay
      • 8 MW diesel power plant by King Energy Generation Inc. in Pagadian City
      • Construction of Highland Road Network (connecting KM-10 and KM-20 in Brgy La Paz)
      • Construction of 59km farm to market roads
      • Completion of Zamboanga West Coast Road
      • Construction of about 13 bridges particularly in the Sibuco-Sirawai area
      • Relocation of the Zamboanga airport
      • Construction of Olutanga bridge
      • Construction of Zamboanga City Bypass Road
      • Construction of Zamboanga del Sur Eastern Coastal Road
      • Rehabilitation and improvement of Zamboanga City port and Sangali Fishing port
      • Modernization/Upgrading of Dipolog City and Pagadian City Airports
      • Development of mini hydroelectric power plant at Josefina, Zamboanga del Sur

REGION 10: NORTHERN MINDANAO

REGION 10: NORTHERN MINDANAO

  • GRDP Growth Forecast

 

2014

2015

2016

GRDP

8.0 – 9.0

8.5 – 9.5

8.5 – 9.5

Agriculture

7.2 – 8.2

7.7 – 8.7

7.7 – 8.7

Industry

8.2 – 9.3

8.7 – 9.7

8.7 – 9.7

Service

8.2 – 9.3

8.7 – 9.7

8.7 – 9.7

  • Plans and Projects
    • Infrastructure developments
      • Expansion of terminal and runway of Laguindingan Airport (priority)
      • Capacity enhancement of Mindanao Container Terminal (priority)
      • Laguindingan Seaport (feasib)
      • Improvement of seaports
      • Panguil Bay Bridge
      • Establishment of an expressway system to support the expanded Cagayan-Iligan Industrial and Trade Corridor
      • Paving of 1,899.93km of national arterial and secondary road (71.82% completed as of 2012)
      • 24km road widening in Opol-Laguindingan Section (4.17% completed as of 2012)
      • 45km road widening in Iligan-Laguindingan Section (to start)
      • Construction and repair of 987km farm to market roads (12.05% completed as of 2012)
      • Construction of passenger terminal in Cagayan de Oro port and Iligan Port
      • Construction of Mindanao Railway System along the Cagayan de Oro-Iligan Corridor (124.65km)
      • Implementation of Agus 6 Hydroelectric Plant Uprating Project (improve capacity to 2 x 31MW)
      • Construction of 13,437 classrooms by 2016 (8.59% completed in 2012)
      • Road widening of Butuan-Cagayan de Oro-Iligan Road and Sayre Highway into 4 lanes
      • East West Lateral Road (Bukidnon-Iligan Road)
      • Tubod-Ganassi Road
      • Misamis Oriental-Bukidnon Bypass Road (Alae-PHIVIDEC Section)
      • Cagayan de Oro-Laguindingan Coastal Bypass Road
      • Iligan City Circumferential Road (C-3)
      • Ana-Malitbog-Las Nieves-Butuan Road
      • Kapalong-Talaingod-Valencia Road
      • Iligan Coastal Bypass Road and Iligan Bypass Road (Buru-un Causeway)
      • Ozamiz Coastal Bypass Road
      • Construction of 16,932.30km bridges
      • Construction of 85.15km roads
      • Wind farm in Camiguin (proposal)
      • Baloi Plains Flood Control Project
      • Provision of 123,047 houses by 2016
        1. 23,833 units socialized and economic housing
        2. 12,949 units permanent shelter for Sendong survivors
        3. 122 units medium rise housing
      • Industry developments
        • Establishment of packaging center
      • Agriculture developments
        • Establishment of an integrated agri food park
        • Establishment of village level processing centers
        • Establishment of food terminals and packing houses
        • Establishment of seed storage facilities and laboratories
        • Construction of Tulay ng Pangulo

REGION 11: DAVAO

REGION 11: DAVAO

  • GRDP growth of 7.5% from 2010 to 2016
    • Industry will be the main driver
  • Plans and Projects
    • Agriculture developments
      • Establishment of agro-eco zones, e.g. Davao Food Exchange Complex and Agri-Pinoy Trading Center
      • Improvement of Davao and Sta. Cruz Fishport Complex
    • Infrastructure developments
      • Widening of national arterial roads particularly the Agusan-Davao Road and Davao-Cotabato Road
      • Construction/Opening of strategic local roads (provincial, city, municipal, barangay) and strategic farm-to-market roads in Davao Oriental and Compostela Valley
      • Construction of a bridge that will link the Island Garden City of Samal to Davao City (feasib)
      • Improvement/Concreting of access road to Tagpopongan Port in the Island Garden City of Samal
      • Pursue preparatory work for the opening of Padada-Columbio Road in Davao del Sur and improvement of Kapalong (Davao del Norte)-to-Loreto (Agusan) Road
      • Construction of RoRo port in Panabo or Tagum City to connect to IGaCoS (feasib)
      • Improvement/Expansion of Davao (Sasa) Port, Davao City
      • Improvement/Expansion of ports in Babak, Maco and Mati City
      • Construction/Installation of 300-MW Therma South Coal-fired Power Plant in Davao del Sur/Davao City
      • Construction/Installation of 15-MW EEI Heavy Fuel Oil Power Plant (private sector led investment) as embedded power for Davao del Norte Electric Cooperative
      • Construction/Installation of 6.7-MW Tudaya Hydro 1 Power Plant and 7-MW Tudaya Hydro 2 Power Plant at Sta. Cruz, Davao del Sur (private sector led investment)

REGION 12: SOCCSKSARGEN

REGION 12: SOCCSKSARGEN

  • GRDP Forecast

 

2014

2015

2016

GRDP

8.2 – 9.2

8.3 – 9.3

9.1 – 10.1

Agriculture

4.0 – 5.0

4.0 – 5.0

4.0 – 5.0

Industry

11.0 – 12.0

11.0 – 12.0

12.0 – 13.0

Service

9.0 – 10.0

9.0 – 10.0

10.0 – 11.0

  • Plans and Projects
    • Target investments by 2016: Php 11,800.20 million
    • Infrastructure developments
      • Construction/Improvement of National Roads
  1. Kalamansig- Palimbang- Maitum Road
  2. Surallah-Lake Sebu- Maitum Road
  3. Banisilan-Guiling-Alamada-Libungan Road
  4. GSC Circumferential Road
  5. Cotabato City Circumferential Road
  • Development/Improvement of Airports and Seaports
  1. General Santos City Airport Improvement Project
  2. Cotabato (Awang) Airport Improvement Project
  3. Central Mindanao (M’lang) Airport Development Project
  4. General Santos Port Improvement Project
    • Rehabilitation of RC Wharf (Phase 1)
    • Port Expansion and Reclamation with Open Storage (37,400 sq.m.) Phase 1 and 2
  5. Glan Port Development Project
  6. Construction of Timaco Seaport
  • Flood Control Projects along two Major Rivers (Ala, Rio Grande de Mindanao) in the Region
  • Construction/Repair/Rehab of Irrigation Systems
    1. Rehabilitation of Lambayong River Irrigation System (LamRIS)
    2. Malitubog-Maridagao Irrigation Project Phase II (MMIP II)
  • Construction of Public Transport Terminal in Urban Centers of Region XII
  • 5km road improvement/rehabilitation per year from 2014 to 2016
  • 8km road widening and concreting from 2014 to 2016
  • 700m bridges construction from 2014 to 2015
  • 6,820 elementary buildings by 2016
  • 2,199 high school buildings by 2016
  • 5,145 housing units for the Resettlement Assistance Program to LGUs to delivery from 2014 to 2016
  • 2,000 housing units for the indigenous people to deliver from 2014 to 2016

REGION 13: CARAGA

REGION 13: CARAGA

  • Plans and Projects
    • Industry development
      • Establishment of coconut processing plant in Siargao (feasib)
      • Establishment of fish processing plant in Surigao del Norte (feasib)
    • Infrastructure developments
      • 32km of national road network development
      • 75km national road upgrading
      • 04km construction and maintenance of bridges along national roads
      • 81km construction and improvement of access roads to seaports
        1. Road widening of access road at entrance of Nasipit port
      • 61km construction and improvement of access roads to tourist destinations
      • 05km roads to conflict-affected areas
      • Improvement of Surigao City Airport
      • Improvement of Sayak Airport (Siargao) into a secondary airport
      • Refurbishment of Tandag Airport
      • Refurbishment of Bislig Airport
      • Expansion of Surigao port, Nasipit port, Lipata port
      • Wharf extension at Masao port
      • Construction of breakwater at Masao port
      • Construction of office and passenger building at Butuan port
      • Construction of RC Wharf at Hayanggabon port
      • Construction of RORO port (Dona Helene port)
      • Construction of RORO port (Buenavista port)
      • Construction of RORO port (Jubang port)
      • Rehabilitation of the following irrigation system
        1. LARPIS
        2. Cabadbaran RIS
        3. Andanan RIS
        4. Umayam River Irrigation Project
        5. Tago RIS
        6. Bislig City Integ. Devt. Project
        7. BCIDP-Irrigation Component
        8. Umayam CIS
        9. Gibong RIS
        10. Maasam RIP
        11. Bahayan CIS
      • Construction of the following irrigation system
        1. MAP CIP
        2. Kitcharao SRIP
        3. Puyo CIP
        4. Lake Mainit IADP
        5. Ojot RIP
        6. Bataan CIP
        7. Libang RIP
        8. Guadalupe PIP
        9. Causwagan CIP
        10. Candiisan CIP
        11. Dimasalang CIP
        12. Anislagan CIP
        13. Solibao RIP
        14. Lugom RIP
        15. Umayam
        16. Ihaon RIP
        17. Mambagongon CIP
        18. Mambalili PIP
        19. Ana CIP
        20. Lagcogangan CIP
        21. Theresa CIP
      • 50MW geothermal power addition by 2015
      • 8MW hydropower addition by 2015
      • 8MW biomass power addition by 2015
      • Potential power projects
        1. 20MW Biomass PP in Agusan del Sur
        2. 15MW Nuventa Wind Power Plant
        3. Wind power plant in San Jose Dinagat Island
        4. 40MW wind power plant in Siargao
        5. Bega Falls Hydropower Plant
        6. Hubo River Hydropower Plant
        7. Sipangpang Falls Hydropower Plant
        8. Tinuy-an Falls Hydropower Plant
        9. 30MW Puyo River Hydropower Plant
        10. 50MW Wawa River Hydropower Plant
        11. 5MW bunker-fired power plant in Agusan del Sur
        12. 100MW coal-fired power plant in Surigao del Sur

CORDILLERA ADMINISTRATIVE REGION

CORDILLERA ADMINISTRATIVE REGION

  • GRDP Forecast

 

2014

2015

2016

GRDP

4.5 – 5.5

5.5 – 6.5

5.5 – 6.5

Agriculture

4.5 – 5.5

5.5 – 6.5

5.5 – 6.5

Industry

4.5 – 5.5

5.5 – 6.5

5.5 – 6.5

Service

6.5 – 7.5

6.5 – 7.5

6.5 – 7.5

  • Plans and Projects
    • Infrastructure developments
      • Cordillera Roads Improvement (in particular, the Tabuk-Kabugao sections and Kabugao-Pudtol-Luna-Abulog sections)
      • Improvement/replacement of 55 bailey bridges and 1 timber bridge along national roads into permanent bridges
      • Development of transport linkages running across North-South trunk lines (e.g. Cordillera Roads), East-West laterals and main arterial roads
      • Awarded hydropower projects (as of 05312013)
        1. 600MW HPP in Apayao (1)
        2. 10MW HPP in Benguet (17)
        3. 20MW HPP in Ifugao (7)
        4. 32MW HPP in Kalinga (5)
        5. 8MW HPP in Mountain Province (11)
      • Indicative HPP capacity additions
        1. 175MW Abra/Binongan (feasib)
        2. 360MW Apayao/Agbulu (feasib)
        3. 75MW Benguet/Nalatang (feasib)
        4. 22MW Kalinga/Pasil
        5. 6MW Mountain Province/Talubin
        6. 9MW Mountain Province/Can-eo
      • Development of geothermal power plants in Dakla Benguet, Pasil Kalinga, BatongBuhay Kalinga, and Buguias-Tinoc Ifugao